Triveni
Signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Rajib Nayan Chaudhary |
| India , 12/30/2008
|
| Query: Dear Mr
Jitendra Gupta, - Recentlly Triveni has
advertised, that the flats at Signature (Sec 89)
& Galaxy (Sec 78) are available at the price
of Year 2005. It means the prices of the
rawmaterials have come down at the level of 2005
at the time the project was launched. Now my point
is (1)why they are still holding the excelation
clause removal letter for Signature, when todays
prices are at par with 2005.(2) The site progress
is damp slow as compared to the other projects
like ferrous etc, infact in signature, expect the
work on few BSF towers, hardly these is any
progress. in such scnerio why the flat owners bear
the extra cost. your views will be appreciated
regards, |
| Reply: You have
not noticed that the basic sale price for a 2bh of
1175 sq ft is 19 lacs which is more than 1600. so
it is atleast 200 psf more than what anyone has
bought. 2005 prices are reflective of industry and
not their own prelaunch prices.
| |
|
 |
Triveni
Signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Pradeep Shrivastava |
| India , 12/24/2008
|
| Query: Dear
Sir, December 08 is also approaching to an end.
There is not much development at site. S towers
are almost untouched. Now what is your next target
date, by when some work will be visible for S
towers. |
| Reply: I dont
have any timeline from company so far. Customers
are also requested to check directly with company.
possibly send emails and registered posts.
| |
|
 |
Regarding
progress in Signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Pawas Agrawal |
| India , 12/24/2008
|
| Query: Hi
Jitendra, Further to your earlier response
regarding Signature photos,when do you think the
structure will be visible . Regards Anand |
| Reply: Maybe
sometime next month. We would check out the site
early jan again. | |
|
 |
Triveni
Signature-2 (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Arvind Chaudhary |
| India , 12/16/2008
|
| Query: maps are
pending. Problem genuine. Its been more then a
year since I booked the falt (35% payment) and the
project still has not been officially launched.
Could I get the money back legally - with
interest? |
| Reply: you
should talk to company or request shifting to
galaxy or signature if possible.
| |
|
 |
About the
reputation And Possesion (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Manish Tripathi |
| India , 12/11/2008
|
| Query: Hi, Do
you really suggest Triveny Signature is a good
option for end user because I am looking at it and
secondly what will be the possesion time for it
because earlier it was heard that Tilpat Firing
Range was the proposed site for Commonwealt Games
2010 but now as it is not approved does that
result in late completion of project and
possesion. |
| Reply: this
area development has nothing to do with tilpat
range. In signature development is slightly slow
presently. That way galaxy is proceeding better.
| |
|
 |
Photos
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Himanshu Karki |
| India , 12/8/2008
|
| Query: Hi
Jeetendra, It has been long time no photos are
there for Signature. Whats happening there?
TRIVENI too is not updating its site for the
photos. Please suggest them to do so as it gives
more clear and crisp image of the work. |
| Reply: I had
informed earlier as well, that s towers were taken
up later almost in nov and it takes minimum of 2-3
months for a visible structure.
| |
|
 |
status
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
U Sharma |
| India , 11/28/2008
|
| Query: hello
jitender ji, its really been long heard from
triveni signature, sector 89 what are they doing,
claiming that construction will complete till 2010
cannot do that no sign of progress no demand what
is going on we are really worried whether we will
get anything |
| Reply: s blocks
were taken up later. A visbile construction not
likely before dec end or early january.
| |
|
 |
Non receipt of
Builder Buyer Agreement (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Prashant Aggarwal |
| India , 11/24/2008
|
| Query: Dear Mr
Gupta, I have signed my part of Builder Buyer
agreement in Jan08 this year. But till date I have
not received my copy. When I have approched
Trivani Mr Monu Sharma in Aug he has assured that
I will get the same by Max Oct. But till date I
have not received this. Requestyed to please let
me have status o nmy flat This was alloed to me in
R1 Tower & Flat no was 103. Regards. |
| Reply:
Agreements for signature II are presently not
being executed. map approval is awaited and
expected shortly. | |
|
 |
where to invest
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Neeta rajwar |
| India , 11/20/2008
|
| Query: hi
jitendra, I am planning to buy my dream house in
faridabad,but am very confused about whom to
choose.Known buliders are out of my budget and
dont feel like trusting the small builders during
global meltdown. I am interested in Triveni
signature towers project , KST and piyush. Kindly
suggest which one is better and wil give
possession on time. |
| Reply: triveni
galaxy is better of the lot.
| |
|
|
|
|
 |
RTI Meeting
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
S. Ram Sharma |
| India , 11/10/2008
|
| Query: Thanks
for arranging the RTI meeting on 15 Nov. Hope, all
those who have responded earlier will be attending
thus making it great sucess. I too will be
attending. It make good sense if one or two
representative from each sector join so that
different views, points can be discussedand put
forwarded. Now it is the turn of investors to
honour your arrangement. Also pleased to note that
the said meeting will go on even with one or two.
Regards |
| Reply: noted.
If things go on well, i propose to initiate an RWA
of entire greater faridabad which could take up
issues time to time with authorities and if reqd
developers also. If people still cant wake up,
atleast they should stop cursing.
| |
|
 |
No development
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
P.K. Rai |
| India , 11/7/2008
|
| Query: Sir, two
days back I visited Triveni Signature. I was
surprised to see literally no development of S4
tower. Not only S4, but also all S towers. |
| Reply: It is
not that there is no development on site. The work
initially started on towers classified as B and
since S ones are adjacent work would spread to
them. I think you missed by posts in last 2 days
where i have confirmed that visible development on
any S towers not expected before dec end.
| |
|
 |
Tower Status for
S3 (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Sagar Sidana Sidana |
| India , 11/5/2008
|
| Query: Hi Can
you please update us on construction progress of
Tower S3, when is the next demand expected for
this tower? TIA |
| Reply: all S
towers are at initial stage. Visible work progress
and installment expected dec end.
| |
|
|
|
|
 |
Triveni Galaxy
& Signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
P Kumar |
| India , 10/29/2008
|
| Query: I have
invested in Triveni. I am having sleepless nights
as I have invested one each in Galaxy &
Signature. |
| Reply: builder
and project is safe and sound. Liquidity crunch is
at the doorsteps of every developer. Fortunately
triveni has a land bank against which not much
money has been raised through prelaunch in cities
like ghaziabad, dharuhera, rewari etc. Development
also had some equipment bottleneck which is
already resolved now. Patience is the only thing
required now. | |
|
 |
S1 next
installment (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Ajay singh |
| India , 10/20/2008
|
| Query: Hi, Any
idea, by when do you think the work will start for
S1? and when should I expect the next installment.
|
| Reply:
signature demands not expected before nov end or
early dec. Next demand is once stilt roof would be
casted which should take atleast that much time.
| |
|
|
|
|
 |
No development
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Sanjeev Singh |
| India , 10/19/2008
|
| Query: Sir,
yesterday I visited the site. I was surprised to
see that there is no development in any tower
except BSF towers. Work is going on only in BSF
towers, particularly in B1 and B2. Please raise
this issue with Triveni. |
| Reply: already
raised, some work is there in other towers as well
but not as much as bsf towers. But i am not
expecting a meeting before diwali.
| |
|
 |
HI (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
ankur s |
| India , 10/15/2008
|
| Query: Can you
please upload images with date rather than just
name of the tower as it helps. How is the progress
on S-1 tower in signature. Seems to be very slow.
I hope Triveni can match the customer expectations
in this time. |
| Reply: all new
upload images are more or less of the date on
which breaking news is flashed. details not
available for signature as of now. since licenses
and map approvals were delayed vis-a-vis galaxy,
so would be the development.
| |
|
 |
credibility of
signatures project (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
amit sharma |
| India , 10/15/2008
|
| Query: sir, may
i plse know the latest about the
signatures,faridabad project. secondly when is it
likely to be completed ? thirdly where do you rate
it as an investment option. thanking you. |
| Reply:
construction started. Possession likely 2010 end.
Should well appreciate by possession time as quite
low priced. | |
|
 |
query
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Prem Joshi |
| India , 10/13/2008
|
| Query: Hi,
could you please provide status of Tower-S4 in
signature. When should I expect the next
installment? thanks. |
| Reply: status
awaited. would take some time to update. and would
be done in due course of time. otherwise pmt
should be expected in nov/dec.
| |
|
 |
Triveni vs BPTP,
sector 89 vs sector 77 (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Nishit Dube |
| India , 10/8/2008
|
| Query: I am
looking to buy a 3bhk in triveni signature
flats(sec 89), why is the rate only 1400.... will
it be safe to put all my money there? |
| Reply: Rate is
1400 because of market conditions, delayed
license/map sanction and therefore development and
less no of endusers compared to speculators. I see
no issues with project rather around 300 hundred
BSF employees also have bought flat in the
project. | |
|
|
|
|
 |
Planning to buy
a 2 BHK in Faridabad (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Khushboo Jha |
| India , 9/30/2008
|
| Query: We are
planning to buy a 2BHK in Faridabad. We have
visiting,so many times, to Neharpar projects. Pls
advice us on Triveni Signature project. |
| Reply: our
marketing team would get in touch with you.
| |
|
 |
Triveni
signature B-I position (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
puneet sood |
| India , 9/26/2008
|
| Query: I would
like to know the currrent construction status of
B-I Tower of Triveni Signature, sector 89. If
possible please upload some current snaps of the
same project. |
| Reply: Already
replied. photos already in images section.
| |
|
 |
position of
project (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
seema sood |
| India , 9/26/2008
|
| Query: I have
booked a flat in Triveni signature, sector 89
faridabad. I wanted to know the position of
tower-B-I. If possible please upload the photo.
|
| Reply: B1 is a
block/cluster and not a tower. I am in process of
getting detailed status shortly.
| |
|
 |
Current Status
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
K Mondal |
| India , 9/24/2008
|
| Query: I would
like to know the currrent construction status of
S2 Tower of Triveni Signature, sector 89. If
possible please upload some current snaps of the
same project. |
| Reply: Snaps
have been clicked for several projects and ae
being organised. We should be able to upload by
tomorrow some time. | |
|
 |
escalation
clause (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
sanjay nagpal |
| India , 9/23/2008
|
| Query: Dear Mr.
Jitendra, May i know for how many (appx) person
has got letter from Triveni regarding removal of
escalation clause( for triveni galaxy), . And also
pls let me know that whether they have issued this
letter directly to investor. |
| Reply: No
letters issued for signature to the best of my
info. only done for galaxy.
| |
|
 |
Map approval
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
VIJAY KATARIA |
| India , 9/23/2008
|
| Query: Hi
Jitendra, Could you please advise why the maps are
not being approved for Triveni signature R2.
|
| Reply:
Signature 2 was bought and licensed much later
than signature 1 and that is why prefix 2. Maps
filed. expected in 2-3 months.
| |
|
|
|
|
 |
RTI
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
suresh p |
| India , 9/18/2008
|
| Query: NICE TO
SEE BUILDING UP OF RTI FORUM. ALREADY FILED RTI
WITH DISTT .TOWN PLANNER FBD. THOUGH THE
AUTHORITIES ARE RELUCTENT,BUT WE NEED TO
CONTINUOUSLY PERSUE. Many RTI applications need to
be submitted for each topic, forcing aothorities
to share info. DRAFT OF RTI IS AS UNDER: Subject:
Information required under RTI act. In Neharpar
Faridabad, many builders/developers have been
given license by the Haryana Govt , to develop
residential projects at various locations in
sector-70 to sector-90. All these builders would
construct tens of thousands of flats. I am also
one of the flat applicants in a project at
sector-89. As this area is coming up in big way, I
would request the authorities to let the general
public know the action plan for development of
various infrastructure facilities like- roads,
water supply, electric supplies, sewerage etc. The
following points may be replied: 1. Date wise
& builder wise how much EDC (external
development charges) have been deposited, till
date? 2. What facilities would be provided by
Government agencies? Please name the concerned
agencies/departments responsible for each of the
activities. 3. Which facilities would be developed
by HUDA? What is the status of these works, till
date? What is the target date of completion of
these works? 4. For improving the connectivity to
these new sectors, whether new road projects are
coming up (or approved by the Government (Central/
Haryana/ UP)? Please name these & the
departments concerned. The current status &
target may also be mentioned for each. 5. Whether
HUDA will develop the internal sector roads? If
yes, what is the status, plan & target
particularly for sector-89. 6. Please provide the
map showing the internal sector roads for
sector-89, showing the plots allotted to
builders/developers in these 2 sectors. I have
deposited the required fee. In case, additional
amount is required to be deposited, the same would
be deposited on getting written information.
Thanking you, |
| Reply: thanx a
ton. We are counting you in as well with us.
| |
|
|
|
|
 |
Present Status
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
S Ravi |
| India , 9/16/2008
|
| Query: I want
to know the present status of Triveni Signature,
sec-89. Approximately when the next demand letter
may come. Can you please upload some latest images
of the same project. |
| Reply: images
soon. Installment expected next month.
| |
|
|
|
|
 |
Project rpogress
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
deepak sharma |
| India , 9/8/2008
|
| Query:
Yesterday we visit entire sec.88 &
Sec.89.,progress of different project are given
below 1. RPS Savana Good 2. KST Good 3. Piyush
Good 4. Ferrous Good 5. Triveni Signature
Disappointing(as work for few towers have not been
started yet). |
| Reply: RPS/KST
was prelaunched a year ahead of triveni and in
lines with omaxe and bptp. in that regards RPS is
rather lagging behind as i see it. Ferrous has
received cancellations of its most bookings and
currently to the best of my resources has a few
hundred booking left. so only few towers are to be
constructed. In Triveni number of apartments are
thousands and not all towers can be started at
same time. work is going on. pictures would be
uploaded shortly. some more equipment has arrived
which should commission anytime and increase the
speed/capacity to double.
| |
|
 |
hi (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
akr s |
| India , 9/3/2008
|
| Query: Can you
please post latest snaps for 89 ? I guess there
should be some progress.. |
| Reply: we shall
be doint it shortly. Unless a stage a is reached
no point really pasting a picture. Milestones are
important to establish status of journey.
| |
|
 |
3BHK In Triveni
Signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Samar Bhatia |
| India , 7/31/2008
|
| Query: Hi
Jeetu, I want to purchase 3BHK (1495 sq. ft) in
Signature. Could u tell someone to contact me and
inform that booking in which tower will be better.
|
| Reply: we can
assist you in that and would get back shortly with
all details. | |
|
|
|
|
 |
Removal of
Escalation clause (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Hemant Agrawal |
| India , 7/23/2008
|
| Query: Hello,
Earlier you mentioned, that Triveni will send the
letters for the removal of escalation clause for
Triveni Signature, like the sent for Triveni
Galaxy. Any updates on that? thanks Hemant |
| Reply: matter
is still pending. It has been represented to
management a couple of time but they have not take
any final decision on the matter.
| |
|
 |
Triveni
Signature Phase II (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Amit Kumar |
| India , 7/21/2008
|
| Query: Hi
Jitendra ji I appreciate your efforts to guide
people about there investments in property and
creating an informative website. I have posted you
a query, Can we identify the location of signature
phase 2 if we visit Faridabad Sector 89. I have
invested my hard earned money in Triveni and it is
more than 2 years. Now they have got the license
so i can expect they must have acquired the land.
I am eager to have a look for its location and
progress. Please let me know if you get inforation
about its location. Thanks, Amit |
| Reply: location
is clear, identied and accessible. Land was bought
and acquired almost an year back. You cannot get
license without it. | |
|
|
|
|
|
|
|
 |
Triveni
Signature Phase II (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Amit Kumar |
| India , 7/15/2008
|
| Query: Do you
have any map which can show exact location of
Signature phase II in Sector 89. If we visit the
location can we identify Signature phase II land.
Have triveni put some hoardings there. |
| Reply: let me
get back on this, i would see what best is
possible at this point of time.
| |
|
 |
Refund of
Booking Amount. (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Neel Bhadra Mani Ghatiyara |
| India , 7/5/2008
|
| Query: Dear
Jitendra, I booked a 2BHK in Signature in Dec 06
for end use purpose. After that due to very slow
progress of the project and very very poor
response from Banks, I have not been able to take
the allotment. For a very long time Banks were
only approving and not disbursing. Now since
Dec-07 I have been constantly approaching Triveni
for cancellation of booking and refunding my
money. They have always been telling me that the
refunds have been on hold from company and I need
to wait for one or two months. Now after 6 months
of rigorous followups they are saying that I can
take the refund on following conditions : 1) they
will deduct 20% from booking amount. On what
grounds can they deduct money? 2) They will give
the cheque only after one month of surrender of
papers. Why are they taking so long for issuing
the cheque ?? 7~10days is still understandable but
1 month is too long. 3) Also they say they will
give and PDC of 3~4 Months? Why is that and on
what grounds can they do that? 4) As an consumer
do I have some legal rights like consumer forums
etc where I can take up this issue? 5) After such
kind of responses from Triveni, Would you still
say that Triveni is an geniune builder and the
Project is good.???? |
| Reply: banks
were funding project for quite some time. If not
galaxy then atleast signature. If customer refuses
allotment, refund is discretion of company. As
much as i know there are no legal rights. Talking
to company or taking allotment are only options.
| |
|
|
|
|
 |
sa (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Sarbjeet Arora |
| India , 7/3/2008
|
| Query: Hi
PLease let me know more abt Triveni Signature and
rate psf....... its reliable or not? |
| Reply: rates
1400 psf. Group reliable. All land and licenses in
place. Construction started. Market is improving
everyday. The day last few speculators would make
an exit, none would be able to stop project from
growing into a fine investment.
| |
|
|
|
|
 |
Buy
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Deepak Kumar |
| Germany , 6/28/2008
|
| Query: Hello
Jitender, i am interested in buying 2BHK in
resale.Could you plz tell me how upfront payment
will be required?Are banks funding this Project?If
you have any flat in resale please give me the
details. |
| Reply: bank
funding on. Upfront close to 8-9 lacs. We will
check availability and get back.
| |
|
 |
status
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
m gulati |
| India , 6/27/2008
|
| Query: Hi
Jitender ji, Please update on what is going on in
Triveni Signature- what is the progress, please
upload latest pictures, when is the next demand
expected, why is work going on so slow, will they
able to meet there target. |
| Reply: pls read
previous replies. Just choose triveni signature as
project. Most questions would be replied. No point
repeating. | |
|
 |
Signature-2
status? (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Arvind Chaudhary |
| India , 6/25/2008
|
| Query: How
confident are you that this would be completed by
2010? The expectation I was given at the time o
fbooking was that the maps would be aproved by
Nov-07 or at the most Dec-07. What are the
bottlenecks? |
| Reply: when you
were buying signature 2, you were given many
comaprisions and logics that galaxy is recommended
over signature and particularly over signature 2.
Maps have taken much longer for most projects in
the are than the routine 2-3 months. Rps savana
was prelaunched in 2005 end, licensed in 2006 end
and map approval in 2007 end. Triveni has managed
to get maps for both galaxy and signature. I am
sure they should be able to get it shortly for
signature 2 as well. | |
|
|
|
|
 |
triveni sign
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
princy gandhi |
| India , 6/11/2008
|
| Query: HI
JITENDER, PLS ADVISE THE STATUS OF TRIVENI
SIGNATURE PH-2.. HAS THEY GOT THE THE MAP
APPROVED??AND ALL THE LEGAL FORMALITIES ARE OK ???
WHEN THEY ARE PROMISING THE POSSESSION... THANKS
IN ADVANCE |
| Reply: i would
update status within this week.
| |
|
 |
triveni
signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
prashant agrawal |
| Australia , 6/8/2008
|
| Query: hi
jeetendra..what is the progress of much publicized
FNG Expressway passing thru faridabad..when do u
think it will be commissioned..thanks |
| Reply: Badarpur
flyover, metro, FNG expres way. all these have
been approved in principle by various govt
agencies. i dont want to give timelines unless and
until work commences on ground level within the
limits of district faridabad.
| |
|
|
|
|
 |
Triveni Sector
78 or secotor 89? (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Ankur Jain |
| India , 6/2/2008
|
| Query: HI
Jitenderji, I want to invest in 1705 or 2090 sq.
appt (standard) in triveni, I woul like to know
your views on which of the 2 projects from triveni
to invest in. Sector 78 or sector 89? Please
answer for below 2 scenarios - 1) Staying invested
for 4-5 years. 2) Better sector to live after 4-5
years. Also please let me know if you have
anything in resale in 2090sq ft. Regards, Ankur
|
| Reply: i find
sec 78 better. consider 2250 instead.
| |
|
 |
Rates PSF
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Deepak Saklani |
| India , 5/29/2008
|
| Query: Hi Mr.
Jeetendra, I have booked one 3BR semi deluxe flat
through you around one and half years back. Today
what I can see is that the rate you have offered
that time for semideluxe flat is same as Deluxe
flat now. Can u share some of your knowledge on
this also? |
| Reply: prices
have not really changed except that ou might
partly encash the discount (if booked in original)
provided unit is allotted.
| |
|
 |
Development
Status & Next Payment (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Arvind Srivastava |
| U.S.A , 5/25/2008
|
| Query: Hi
Jitendra, I have booked 3 BHK in Triveni
Signature, Sec-78. Curious to know about - 1. What
is development status of T-14 tower. It would be
nice if you can upload some pictures.. 2. When is
next payment and how much it would be? Thanks in
advance. -Arvind |
| Reply: towers
in galaxy are numbered with T while signature ones
begin with S. If it is still signature latest
pictures are in images section. Between excavation
and upto a roof is casted, period is longest and
not much change is visible on day to day basis.
| |
|
 |
Triveni IPO
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Deepak Jindal |
| India , 5/23/2008
|
| Query: Hi
JItendra, As triveni is going for an IPO, is there
any impact of this news on triveni projects in the
market. Have you observed more positivity of
buyers towards triveni Projects. Thanks. |
| Reply: i think
real impact of triveni IPO would be observed only
when it is there, response to it of financial
markets in terms of subscription and post listing
trends. Obviously a listed public company should
have a more improved reputation. And more fund
flows would also affect development of existing
projects as well as expansion plans.
| |
|
 |
Details about
residential project (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Sumit Pal Singh |
| India , 5/19/2008
|
| Query: want to
know details about projects in Faridabad |
| Reply: go to
home pg of indiaspaces.com and click individual
links or if you could come down to our office in
faridabad we can help you choose a project.
| |
|
 |
background of
triveni constructions (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
rajesh bisht |
| India , 5/12/2008
|
| Query: Triveni
does not have a sample flat ready yet. how is the
construction quality of the company? do you have
any history of the company? |
| Reply: as far
as a project of this size it would be better if we
treat them as fresh. they did build a sample which
was done quite tastefully but due to access
reasons it was made on some other piece of land
which was later sold off to omaxe. quality is
expected to be good in line with rest of the
industry. | |
|
 |
builder - buyer
agrremeny (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
suresh monga |
| India , 5/11/2008
|
| Query: can u
please let me know when i can have builder- buyer
agreement from your company , i have already got a
flat alloted in ur project , i want to sell it off
and also have a buyer who has already got his loan
sanctioned from lic housing corporation , but the
lic wants that BUILDER -BUYER AGREEMENT BEFORE
RELEASING THE MONEY , KINDLY DO THE NEEDFUL AND
OBLIGE . suresh monga |
| Reply: if
booked through us contact my admin office else
contact company or your broker. Agreement should
not be a problem. | |
|
|
|
|
 |
price of
projects (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
seema sood |
| India , 5/7/2008
|
| Query: Please
let me know that 11th floor of Triveni will also
give the premeium or only 1st and 2nd floor will
give. |
| Reply: in early
stages higher floor may have lower demand but once
project is near possession, it doesnt really
matter. Infact higher floors have better view.
| |
|
 |
Construction
Status (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Sandeep Agrawal |
| India , 5/3/2008
|
| Query: Hi
Everybody, I have been to Signature site yesterday
and would like to share the present construction
status. Exavation of the two rows was completed
and construction of foundation was in progress
from one end and progressing towards the another
end. Frankly speeking, I went with a mindset that
I will not be able to see anything since I was
doubdting Triveni. BUT to my surprise exavation
was complete and construction started. According
to the progress, I think in 2-3 months basement
work should get completed and I should be ready to
pay next installment. Regards, Sandeep |
| Reply: thanx
sandeep for update. I hope this should improve
confidence. | |
|
 |
flat wanted in
signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
neeti vigya |
| India , 5/1/2008
|
| Query:
hello,wanted to buy a flat in triveni
signature,pls advise prices with complete
charges,if possible pls mail me brouchre and price
list,availibilty,payment,believe they have
launched new phase too,when is posseion for
ph1,ph2,look frwd to reply.pls advise on
mail.thanks |
| Reply: resale
price 1400. for most details click adjoining link
to project. | |
|
 |
Triveni Vs BPTP
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
raman sundaramaya |
| United Kingdom ,
4/30/2008 |
| Query: Hi, is
Triveni better option for 3BR+1SQ or BPTP? WHy is
Triveni PSF rate only 1400 as compared to other
builders in the same locality i.e. RPS which has
PSF rate as 2100? Is triveni a credible builder in
terms of building materials used, ontime
possession? |
| Reply: triveni
original booking is also at 2100 psf marketed as
triveni oxygen. development work is on track and
probably as much as in line with rps (one can
verify that at site as well). It is a type of
investor ratio which is hampering the development
of project. fortunately omaxe and rps could get
rid of them timely. | |
|
 |
allotment info
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
jitendra chanana N/A |
| India , 4/28/2008
|
| Query: dear
jeetender, i had a talk with amit shukla in the
morning and he gave me all necessary info reg the
flat alotment.the rates/sizes/and what i have to
pay.he also confirmed that the flat is available
in sec 89 r block and there is no problem in
getting allotment as of now.i told him that i want
a 3br flat and would get back in one two days
after making the arrangement of the balance
money.he assured that he would go to triveni
office with me and get the allotment done. |
| Reply: pls go
to company once and get your allotment done. Let
me know if you actually face a problem.
| |
|
 |
Construction
Status (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Manoj Aggarwal |
| India , 4/12/2008
|
| Query: Hi Would
you please provide the updated status of triveni
project. i have made 2 installment to the builder
but we have not made 3rd payment because
construction has been very slow and builder has
been selling the land to different builders.
|
| Reply:
excavation going on. builder has lot of surplus
land, so no harm if it diposes some of it. most
developers do that. | |
|
 |
query
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
pooja Bhatia |
| India , 4/11/2008
|
| Query: Hi, As
you answered in a previous question that they cant
put pictures of a space where excavation work is
going on, atleast they can put pictures of theor
any project which is done. also i posted a
questionsometime back which i think is missed in
the list for some reason, i queried about the
comparison between Piyush group & triveni in
every aspect i.e. quality,trust and money. thank
you |
| Reply: pictures
would be posted soon. As regards comparision even
piyush does not have any delivery track records.
All current projects are the first lot of work
they are handling and infact most developers. Even
bptp has no delivered residential project while
they are doing a 1500 acre township.
| |
|
 |
Site Pictures
for Signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Rakesh Malhotra |
| Oman , 4/11/2008
|
| Query: Dear
Jitender Could you please put some pictures of the
development work for Triveni Signature. What about
the no cost escalation clause, I had seen some
customers enquiring about it . |
| Reply: letters
for no escalation would be mailed shortly.
Pictures should be uploaded within next 3-4 days.
| |
|
 |
BB Agreement
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Mohit Arora |
| United Kingdom ,
3/29/2008 |
| Query: Hi
IndiaSpaces, Some postive news after a long time
for the triveni sign investor in terms of map
approval. However the uncertaintiy is still there.
I received the BB agreement around three months
back. I tried to deposit the form at there office
and was expecting them to modify the escalation
clause as suggested by you. They are not aware of
any changes as it is not told to them by their
senior persons. I have not deposited the form till
now as they are still not clear about it. What is
your view? Have they done same for unit holder of
secton 78? Should we submit BB letter now?
Regards, Mohit |
| Reply: for
galaxy letters sent to all. same would be done for
signature as well to entire block. dont hold the
agreements. | |
|
|
|
|
 |
Map Confirmation
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Tarun Saklani |
| India , 3/26/2008
|
| Query: hi
Jitendra ji,Have you received map confirmation for
the project. If not then will it be good to pay
another demand for the same.Please give me Your
suggestion |
| Reply: map
approval is confirmed. excavation is also on full
swing, infact foundation work is underway in some
towers. you have to pay the latest demand.
| |
|
 |
eNVIROMENT
cLERENACE (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Shiv Ram Meena |
| India , 3/20/2008
|
| Query: Dear
Jitendra, What will happend if the enviroment
clearenance is not there? and then why builder is
asking the 4th installment, if it will take so
long. Please respond |
| Reply: Nothing
to worry and that is routine. most developers have
done this way, they begin ground work like
excavation etc. pmts till that stage is demanded.
And subsequently it is received. Honestly speaking
if you wait for everything i.e. approvals to
happend and then do allotments, excavation etc. I
doubt any developer can finish the project in 3
years from date of booking.
| |
|
|
|
|
 |
Status of the
investment (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Jitender Chhabra |
| India , 3/11/2008
|
| Query: Hi Mr.
Jeetender Gupta, I have seen your comments in one
of the blog sites for triveni. its been so long
and there is no progress on part of Triveni.
Moreover I have heard that its selling its land to
Omaxe and other builders. I have 2 2BHK flat at
the booking of 1400 Rs/sqft and I have paid 5 L
each till now for both of the flats. Im intersted
in selling these out, please provide the quotes.
|
| Reply: let us
not go by half baked facts. You can come and see
the site development at galaxy which got approvals
earlier. For signature maps just approved. Omaxe
thing has been clarified n number of times. Maybe
you missed that. A developer is free to sell or
collaborate with any one for surplus land. If you
have a non-allotted unit it is no unit as per us,
you would have to get an allotment or cancellation
is the only exit for which you have to get in
touch with company. Instead of general rumours i
would prefer if you have specific concerns
| |
|
|
|
|
 |
Sec-89,Triveni
Signature (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
mukesh rajput |
| India , 2/22/2008
|
| Query: Dear
jitendra ji,thanx to prompt response to our
querries.i would like to know exact update on
progress of triveni signature sec-89 project.what
is map approval status.Builder buyer agreement is
lying with me i m not filling it until map
approval.is that ok.?and moreover any update on
mre banks who starting funding to that project.
|
| Reply: all
things are linked to map approval which is
awaited. Till then no banks, development etc would
remain on hold. | |
|
 |
Update Required
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Gaurav Kumar Arora |
| India , 2/21/2008
|
| Query: Dear
Sir, I just want to confirm following w.r.t. Nahar
par area (Sector 89) 1. I heard few days back that
work on Badarpur Flyover will start in next 6
months .. Could you please tell me how far is
sector 89 site(triveni ) from badarpur boarder
flyover end ??? How much time apprx. it will take
to complete it ?? 2. FNG expressway end point on
faridabad ( how far it will be from triveni site )
..( Appx distance ) 3. How far will be nearest
metro point from triveni site 4. How far will it
be Greater noida expressway from triveni site
...will there be any connectivity planned Regards,
|
| Reply: 1. Time
taken should be 10-12 min or km once completed
from Greater Faridabad. 2. FNG end point not clear
on ground level presently. 3. Metro station is
porposed to be 3-5 km from Greater faridabad. 4.
FNG is same as greater noida one.
| |
|
 |
Your feedback
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Dheeraj N/A |
| U.S.A , 2/17/2008
|
| Query: Hi
Jitendra, I have written earlier also and you
suggested to mail my question, I did but did not
got any responce till now. I have taken allotment
of my flat in Triveni Signature and wanted your
thoughts on Vastu and location for Building R1
flat # 707. Thanks in advance |
| Reply: I will
soon reply your query once i go through the plans.
| |
|
|
|
|
|
|
|
 |
Rate quoted by
Developer versus the marke price (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
N/A N/A |
| Other , 2/3/2008
|
| Query: Dear
Jitendra Recently I paid a visit to Triveni
Signature and was told by the person representaing
the developer there that the rate is 1900 psf.
However, while I was browsing your website, rate
quoed by interested sellers is around 1400 psf.
Why this difference. How can the builder escalate
the price so much for new buyers? Please solve
this conendrum. Secondly, I am a Civil servant and
want to avail HBA from Government of India. Please
tell me whether I am eligible to get HBA if I
purchase the flate from secondary market (which
apperas to be cheaper) rather than going for
original booking with the developer? |
| Reply:
secondary market transaction can be done in such a
way that paperwork is as good as aoriginal, only
thing is that it would involve a high upfront
though the price would remain at 1400 psf. You
would have to visit our office once to understand
once. As regards the disparity between list price
and market price, that is there in all cities,
projects and developers. Developers set a price
which works more like a target for future.
| |
|
 |
Rate
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
Gagan Singh |
| U.S.A , 2/1/2008
|
| Query: I have
been following your site since Sept 2006 and you
have been recommending to buy Triveni flats which
was Rs 1400/- per sq ft in Sept 2006 and now in
Feb 2008 after 16 months also the rate is same at
Rs 1400/- per sq ft. Do you think something has
gone drastically wrong in your analysis. |
| Reply: Prices
unchanged in last 2 years Omaxe greater noida @
2575 Omaxe Heights Sonepat @ 1350 Omaxe Greens
Derabassi @ 1350 Similar situation for omaxe flats
at baddi, rudrapur, bahadurgarh, lucknow, jaipur
flats. Bptp grandeura @ 1850. Even in case of bptp
princess park distress sales happen even at 1450.
Except omaxe and rps no project has any
significant premiums. Most projects in dharuhera,
bhiwadi, sonepat, mohali, greater noida from
leading developers has not seen any movement in
last 2 years. My assessments are normally till
possession when there is no ifs and buts about
project development and it should command prices
in line with rest of market. There are stages of
buoyancy which unfortunately in case of triveni
has met an hiccup or a conspiracy normally. Like
the christmas party would have taken market in a
much forward direction in terms of credibility and
goodwill. But a bunch of impatient customers
created a scene which resulted in a static
situation and infact they themselves are worst hit
bcoz neither they make money also they made their
own exit more difficult.
| |
|
|
|
|
 |
Map Approval
& others (Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
rishu madan |
| India , 1/19/2008
|
| Query: Dear
Jitu i hv been a regular to ur site , need few
information about the subject project , Is Map
approval for phase 11 is seprate from phase 1 , If
yes then have Triveni filed for same also , When
we r expecting the same ? & more over by when
this project wil be completed , i invested in this
project in Aug 2006 & getting little impatient
with my investment |
| Reply: for
phase 2 i think it should be seperate. it is worth
dwelling on it once signature 1 has reached the
approval stage. | |
|
|
|
|
|
|
|
|
|
|
 |
phase 2
(Triveni Signature
Faridabad) Contact for More
Details See More Projects |
| Posted by :
saurabh dasgupta |
| India , 1/3/2008
|
| Query: hi J
wish u a happy new year! i have a query!! the maps
that have been sent for approvals for sector 89
covers the new phase on FNG also ....or is it a
separate site??? secondly the map uploaded under
images section is which phase?? what are the
adeditional charges/ plc being charged for the new
phase on FNG??? what is the allotment availablity
of this new phase??? thanks in advance. |
| Reply: i am not
sure for signature 2 will have to clarify. All
additional charges same except green PLC here is
150 instead of 100. Maps available for both
phases.
| |