construction
progress (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
subrata patra |
| India , 12/30/2008
|
| Query: sir,
please let me know the construction progress of
T-08,bayberry rps savana with latest construction
photographs of this tower only. thanks wish u a
very very happy 2009 |
| Reply: I dont
have tower level pictures. but we would try
getting am update shortly.
| |
|
 |
Floor Registry
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Sumit Daama |
| India , 12/21/2008
|
| Query: Hi, I
have a 3+1 BHK in RPS savana and also a floor
(G+2) in Gurgaon. I have seen a news on floor
registry bill in your portal. When will this bill
be placed in Assembly. Also what are its chances
of getting passed as I saw some opposing agency as
well in the Assembly. |
| Reply: it is at
proposal stage, let us see how and when it gets
passed, terms and conditions etc. Too early to
comment. A ray of hope is definitely there.
| |
|
 |
bank finance
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
PRABHAT KUMAR |
| India , 12/17/2008
|
| Query: has SBI
been financing any projects in RPS Savana? SBI
demands a sale deed which no seller would be
having. What documentation do other banks take ?
|
| Reply: i am not
sure but most nationalised banks are financing
savana. And if sbi is particular about sale deed
that means we are talking of ready to move
property or they could be talking of sale deed of
entire plot which developer bought.
| |
|
 |
Construction
update (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Pawan Chaudhary |
| India , 12/15/2008
|
| Query: Hi
Jeetu, Hope u are doing well. Wanted to share some
updates about savana. I own a 3 BHK in T-12. (Im
sure you already know :) I went to check the
savana progress on sunday eve. Unlike a lot of
speculations..The construction work is very
satisfactory. Their staff is quite supportive and
took me to the actual tower. 4th floor has started
for t-12....few 3+1 towers are touching 8/9
floors. Their staff did share another
reason(earlier unknown to me) of why few towers
are only at ground level. As per them - Its to
allow free movemet of raw material thru high rise
crane. |
| Reply: Thanx
for feedback. | |
|
 |
Construction
update (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Sudarshan Mishra |
| India , 12/13/2008
|
| Query: Hi, The
latest construction update is available now. RPS
has been really good in posting const updates.
There is an update dated 4-12 and another dated
10-12. Also the construction indicates parallel
activity on brick work and framing of the doors
and windows beside the structure erection. Hands
of to RPS. Surely possession would be in mid of
2010. |
| Reply: Thanx
for update. | |
|
 |
RPS Savana
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
seema joshi |
| India , 12/7/2008
|
| Query: Hi I am
owning a 2+1 apartment in T3 in RPS savana. Its
been one year and still the construction is at
ground floor slab for this tower.. Would like to
know is the slow pace of construction a cause of
concern and if yes, do I have an option, Selling
back wouldnt seem a good choice at this point of
time, I would prefer to remain invested, but would
that be safe option. |
| Reply:
investment is safe. Stay calm and relax.
| |
|
 |
Rentals going
high (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Pravat Singh |
| India , 12/5/2008
|
| Query: Hi, This
is just to share my observation. I have a unit in
RPS savana and stay in rent in one society flat in
Gurgaon. My rentals have been raised from 11k to
16k in a shot. I have been asked to vacate if this
is not acceptable. In this time of pink slips this
is phenomenal. I have queried few more apartments
and there also the rentals are in similar lines. I
must say, I am now more eager to possess my flat
in Savana then ever before. I am pretty sure this
is probably because people prefer renting to
buying property in this crunch time. I also
observed that the rentals all over NCR are sky
rocketing. Jitender Ji, do u see any correction in
residential rentals in the future or this trend is
here to stay. |
| Reply: there is
a large supply coming in entire NCR and even the
sale price are either stable or dropping. So
ultimately rental should come down.
| |
|
 |
Increase in EDC
charges by haryana govt. (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
manit saluja |
| India , 11/28/2008
|
| Query: Haryana
govt has increased EDC charges in Gurgaon for the
construction after 2005 ; Is EDC increase going to
impact Fbad (nehar paar) also ? If yes , then it
is bad thing in current econoic climate ? your
opinion is welcome. |
| Reply: as much
as what understand that is in context to projects
which are in possession now in gurgaon and sold
around 2005 when edc/idc was less. While in
faridabad most projects have an updated edc/idc
charged. | |
|
 |
RPS Savana.
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
B.S Dubey |
| India , 11/24/2008
|
| Query: Hello I
am holding a 3BR flat @1850 in RPS Savana &
would like to sell just after the possession. I
would like to ask you two questions : 1-Will it be
easy to sell that time? 2.How must profit I will
able to book that time? Best regards Dubey |
| Reply: 1. post
possession i dont see any issue to sell. 2. In
present scenario i would not like to predict, my
earlier target was 2800-3000 on possession
| |
|
|
|
|
|
|
|
 |
Demand letter
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
kumar sambhava |
| U.S.A , 11/12/2008
|
| Query: Hello
Sir, I have a flat in RPS T-12 booked through you.
Is there a way to find out whether the demand
letters have been sent at tower level at different
stages of construction? This will help people like
me sitting abroad from becoming a defaulter
because a courier was missed. |
| Reply: Normally
status are updated. If you click project link you
can access time to time. We will try to keep it
updated. | |
|
 |
construction
quality (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
VISHNU NAGER |
| Kenya , 11/12/2008
|
| Query: Dear
Sir, latest photograph of savana are updated but
when you see them closely particularly the peelers
,when they are reaching high looks like crooked or
tilted. is it going to affect the stability of
towers or they will be ok after plaster or final
touch. if it is not ,its a matter of worry??
Regards Vishnu Nagar |
| Reply: rps is a
professional company. There are responsible
architects, contractors and PMC agencies
monitroing the project. Dont look too much into
things also. Dont worry. Your concern however
would be sent to company.
| |
|
 |
Updated
Pictures. (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Dhall |
| India , 11/10/2008
|
| Query: Hi,
Please le me know the location where i can see the
tower wise updated Construction pictures. Thanks
|
| Reply: Some
pictures are available in our images section
itself. towerwise status also available if you
click adjacent link to project or from home pg.
| |
|
 |
Issuance of
demand for Tower 7 (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Gaurav Gupta |
| India , 11/10/2008
|
| Query: Hi,
Wanted to let the users/customers of above project
know that the demand for completion of ground
floor roof slab casting has been sent on 31st Oct.
and the due date for payment at RPS end is 14th
Nov. Best regards, Gaurav |
| Reply: thanx
for update. But i believe this status would vary
from tower to tower. | |
|
 |
future
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
amit sharma |
| India , 11/4/2008
|
| Query: Dear
jeetendra, when do u expect possession to be
offerd at savana,keeping end use in mind how do u
recommend savana, and do you think by the time of
possession the place would be actually livable
with basic amenities like,road
connectivity,water,sewage etc.,if not then by when
|
| Reply: i expect
possession and livability both around 2010.
| |
|
 |
Pic Update
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Mohit Arora |
| India , 11/2/2008
|
| Query: Hi, The
latest pics of the construction progress is
available in the url:
http://www.rps-savana.com/construction.asp. 9
floors of some of the towers is through it seems.
|
| Reply: thanx
for update. | |
|
 |
Question
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Soham Tyagi |
| India , 10/28/2008
|
| Query: Hi, I
have a flat in RPS Savana which I plan to sell. I
am getting a client for 1925 psqft basic price.
Mine is in T-11 (12th Floor) and is a 3BHK. Is it
a good deal. Also I am not able to make up my mind
if I should sell it. My booking was at 1600 -minus
DP discount - dealer discount. Please advice if
keeping it would be more beneficial as an asset or
liquidity at this hour is a better option. I like
the plan and the way Savana is coming up. This
person is a a friend and wants to buy it for end
use. Please advice. |
| Reply: my
target post possession is 2800-3000 psf. You are
getting a good price. In short term bcoz of
liquidity situation prices may come down as well.
So if you have to sell better do it now or
possession would be right time.
| |
|
 |
Hi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Sunil Sharma |
| India , 10/28/2008
|
| Query: Hi,
Happy Diwali to u. I am getting a client for my
2BHK in RPS savana for 1875 psqft. Is it a good
price. My booking was for 1400 CLP. I have my own
flat in Gurgaon. But looking at the way rentals
are going up, is it advisable to think of RPS
savana as one which will yield good rental returns
on completion. |
| Reply: in
faridabad dont buy a residential property for
rental purposes. Rentals are normally low, and
huge supply near possession would affect it
further. Always advisable to sell a property on
possession, convert to rented commercial property
which fetches 8-10 percent return. Residential
returns are 2-3 percent.
| |
|
 |
flat at rps
savana (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
ashish dixit |
| India , 10/23/2008
|
| Query: Could
you please someone to coordinate between the
seller of a 2 bhk at savana with me as i m
interested in the same |
| Reply: pls post
a response through classified section. contact nos
of my office coordinating the same is also
provided in all emails to you. i would also
forward this response for followup.
| |
|
 |
Need to buy
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Tej Prakash |
| India , 10/23/2008
|
| Query: Hi, I am
looking to buy flat in RPS. Could you please let
me know the best price you can offer. |
| Reply: for
resale deals, pls refer to our classified section.
Also price is different for different sizes.
| |
|
 |
Classified
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Rahul Rattan |
| India , 10/22/2008
|
| Query: I have
noticed theres a buyer for bhk at 1700. I am
willing to sell my 2 bhk at 1700 (original booking
1825) at 125 psft discount. Could you please ask
someone in sales team to get in touch with both of
us. (I have already replied to that particular
classified) |
| Reply:
responses are automatically forwarded. and team
also follows up on its own.
| |
|
 |
Tower 8
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Viresh Saxena |
| India , 10/22/2008
|
| Query: I have
bought 2+1 bedroom flat in Tower 8 in RPS Savana
however the constrcution in Tower 8 is very very
slow. Please let me know the reason.Is it
deliberate. |
| Reply: all
towers dont get constructed at same time. it is
routine practice. | |
|
 |
Question
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Hridesh Joshi |
| India , 10/22/2008
|
| Query: Hi, I
had booked a 3BHK in RPS Savana in Oct 2006 in DP.
Till now only 2nd floor roof casting has been done
for my tower. I dont have any problem with them
having constructed ony the 2nd floor. My concern
is whether RPS is good enough to bear the
slowdown. Whats the probabilty of RPS NOT
constructing the Savana. Also what happens to
folks like me who had opted for DP? |
| Reply:
probability of they not doing the project
completely is close to zero percent. They handle
very limited projects and dont over-expose their
stakes. they are comfortable inspite of the
present slowdown. their are images on our site
which show many towers well above 2nd floor. so no
concerns. | |
|
 |
RPS savana
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Manoj Kulhari Kulhari |
| India , 10/20/2008
|
| Query: Hi
jitendra, Unable to find the page with towerwise
status, please gimme the link , thanks in
anticipation....worried as construction of T-7 is
too slow... |
| Reply: it is
being updated. You should get latest status in a
day or two. | |
|
|
|
|
|
|
|
 |
Construction
Status (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
krishna dhiman |
| India , 10/14/2008
|
| Query: I heard,
RPS has got good response on 2BHK and 2+1 BHK
units and they sold almost 100%. But while seeing
pictures of construction status. I found
construction status of these units are at basement
level only but other big units like 3+1 BHK are at
upto 7th floor. My question is the units which are
sold completlely, so why construction is so slow ?
I heard also now a days construction has been
stopped, is this true? if so what is the reason
behind this ? |
| Reply:
construction planning has nothing to do with
sales, based on ground realities and finalisation
of contractors, construction planning is done. I
have not heard any rumours on construction
stopping. | |
|
 |
RPS 3+1
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Ashwin Bhojwani |
| India , 9/30/2008
|
| Query: What is
current market re-sale value for 3+1 BHK on 11
floor. Has G.Faridabad market actually picked up.
|
| Reply: prices
in general have shot up in rps from 1300 to around
1950 psf which is as such 50 percent increase and
given the fact that not all pmt has been done or
if bank leverage is also accounted it could work
out an ROI of even 100 percent. What else would
one expect ? | |
|
 |
Q (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Tanay Srivstava |
| India , 9/27/2008
|
| Query: Hi, I
have 3BHK in RPS savana. They started work around
December last year. Now only second floor work is
on in my tower. So in 10 months if they could make
upto 1st floor only, I can safely say the project
completion is 10 years from today. |
| Reply: if you
check the images section there are towers where
many more floors have been added during the same
time, which is an evidence of the fact that in
such span much work can be completed. So once your
tower would be picked up it would be brought at
par with others. So have patience. And if you have
lost faith knock off the unit profitably and rest
in piece. | |
|
|
|
|
|
|
|
 |
Hi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Nitin Malhotra |
| India , 9/21/2008
|
| Query: Hi, I
really appreciate the way the construction status
of RPS savana is shown. This gives a more real
picture of the construction. Can I assume that
henceforth this will be updated with construction
status. Also is the construction good enough to
meet the 2010 completion deadline. |
| Reply: i dont
see any reasn why project should not be completed
by 2010. For inputs we are dependent on
developers, if they provide us status time to time
we always try uploading as much info as possible.
| |
|
 |
Construction
Pics (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Nayan Krishan |
| India , 9/20/2008
|
| Query: Hi, Are
the pics not updated yet. For the customers it is
a confidence booster in these difficult times for
economy as well as real estate. |
| Reply: pictures
at this stage look more or less similar. A
detailed tower wise status report has been
updated. Just click link from home pg to project
or click adjacent link. | |
|
 |
Question
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Madhav Singhal |
| India , 9/20/2008
|
| Query: Hi
JitenderJi, Do u still hold on to the projected
fig of 2800-3000 at possession in Nehar par. Real
estate corrections are bound to happen in a short
while. I have bought a flat in Down Payment and
every month the emi that I pay, am not sure if
even that much return is expected as of now. Do I
panic sell at a loss or have faith in ur words and
hold till possession. Also with no construction
status update for this month yet, I am getting
little restless. Please advice |
| Reply:
construction status updated in most exhaustive
towerwise manner. In last 3 years i have strongly
discouraged down payment. I am sure even today you
should be able to exit profitably. So why not
instead of getting sleepless nights. Situation is
no different then the short story that on seeing
one fallen fruit from tree, we declare sky is
falling all over the jungle. I HOLD ON MY TARGET
2800-3000 PSF. Still small advise investors
calculating pennies please exit the moment you
could do it profitably or at par. Future is for
endusers and long term investors. Remember in
India housing is not a luxury but necessity. Check
link to project for status.
| |
|
 |
Request to
participate in RTI Forum (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Amit Kashyap |
| India , 9/19/2008
|
| Query: Dear
Sir, I have an apartment in RPS Savana and i am
also interested in knowing Govt Plans on Greater
Faridabad (Nehar Paar) Area. Please subscribe me
as well in the RTI forum. Regards Amit Kashyap
|
| Reply: noted.
thanx. | |
|
 |
possesion
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
sanjay kumar |
| India , 9/17/2008
|
| Query: hello
jitender, We have booked a flat in RPS savana in
nov-2006. At the time of booking they have told us
that possesion will be given in 36 months. Now
they have call us for buyer agreement and in that
they have mentioned that possesion will be given
in nov-2010 as they have got map senctioned in
nov-2007. Is this same for all or some unit
holders are getting possession earlier also.
|
| Reply:
possession date is normally from date of
agreement. Same for all.
| |
|
 |
RPS Savana or
Plot in Parkland (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Shalabh Saxena |
| India , 9/14/2008
|
| Query: Looking
for Re-sale in RPS Savena around 1700/sqft or in
KLJ Greens @1700 sqft for 3BHK both. How do you
see KLJ as a company and location wise, I tried
posted a classified for the same but there was
some error on the site there so sending it a a
query here.. Also can you please let me know about
the Parkland plot price currently i can look to
buy a 250sqyrd plot if i can get somewhere around
11000/sqyrd. |
| Reply: Between
KLJ and RPS I would any day prefer RPS even if it
slightly expensive. I dont see parkland coming so
low, dont waste your time. technically it is till
around 15k psy and with most payments made there
is no selling pressure as well. Try to post a
classified, meanhwile we would also check for
errors. | |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Anand |
| India , 9/12/2008
|
| Query: Hi, Has
the work on the Badarpur Flyover started. Also is
the 2010 deadline for Badarpur Metro ON. Do u
foresee any appreciation due to completion of both
of these. |
| Reply: badarpur
and metro upto badarpur are expected to be
completed by 2010 end. Increased connectivity
should improve the prices but that has already
been factored in current prices of most projects.
New offerings are in the range of 2350-2500 psf.
| |
|
 |
Question
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Shraddha Tulsiani |
| India , 9/12/2008
|
| Query: Hi, With
BPTP and TRVIENI coming with flats for 20L and RPS
coming with lower cost RHYTHM, the resale market
is badly crippled. Do u see the resale market
revamping in next 2-3 months. If the builders keep
on launching such projects I dont forcast any good
weather prevailing in Naharpaar in the near
future. |
| Reply: each
project has its own market, dont feel crippled by
short term developments. Let possession come,
stage of possession and the way a campus looks on
possession determine its market price.
| |
|
|
|
|
 |
Discount not
recd. (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Shifali Anand |
| India , 9/6/2008
|
| Query: I bought
2+1 unit in RPS @1700/- from a authorised property
agent in sept 2006; he charged Rs. 50 premium he
did not give any discounts, although the company
was offering 4% discount. what should we do?
|
| Reply: nothing
you can do. Discounts be dealer are discretionary
and voluntary by dealer not mandatory. Next time
you buy something do some honework and dont just
buy from anybody. | |
|
|
|
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Vinay Singh |
| India , 9/1/2008
|
| Query: Hi
JitenderJi. Is the metro to Faridabad in tantrums
like the Badarpur Flyover till now. Now its
september and has the work on the flyover started.
|
| Reply: monsoons
are not yet over. new projects in northern india
generally commence post monsoons only. for metro a
news item has already been uploaded in news
section which is self explanatory.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Vikram Arora |
| India , 8/30/2008
|
| Query: Hi, The
approach to Naharpaar can be made better. Now its
very rusty and congested. Is the BPTP bridge going
to be the main connectivity. What will be the
width of the sector roads inside. Besides any
place develops if there are jobs around. Dont u
think Crossings Republic holds an edge there to
Neharpaar Faridabad because of its proximity to
opportunity rich Noida. |
| Reply: sector
roads are generally 60 ft and even 100 ft in many
cases. Though technically maps would have to be
checked. Bptp bridge is going to be main entry and
is evident from master plan itself. Someone in
ghaziabad would enjoy proximity to noida only
while in faridabad options remain open for south
delhi, noida and faridabad. If someone gets job
shift from noida to gurgaon, it would be terrible
commuting from ghaziabad to gurgaon, or one would
have to keep on shifting residences. While in
faridabad one may work anywhere and continue the
residence. | |
|
 |
Rental Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Neha Singh |
| India , 8/29/2008
|
| Query: Hi, We
have a 3BHK in RPS Savana. We plan to possess it
and put it on rent. Do u think this place will
give good rental return as now there are so many
apartments available. |
| Reply: i dont
recommend residential investments from rental
income point of view. Suggested plan - book a
residential, on possession sell and book profit,
buy a commercial from proceeds and get rental
return of 8-10 percent. | |
|
|
|
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Jahen Akhtar |
| India , 8/24/2008
|
| Query: Hi, How
is RPS as a group? Is it wise to buy something in
Savana. I plan end use. Also I plan to buy in
resale. What is the resale price for a 3BHK.
|
| Reply: RPS is a
good group. You should buy it if you have
identified as end user. For resale prices
check/use classified section.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Amrit Ahluwalia |
| India , 8/23/2008
|
| Query: Hi, I
too have a 3BHK in RPS savana taken purely for
investment only. Now with the market plummeting,
do u still hold on to the target figure of 3000/ft
at possession. Also due to rise in input cost I
just read a column in TOI regarding delays in
projects. Is it true with RPS Savana as well. I
bought it in down payment and already its going
1.5 years late due to license related issues. Do u
advice liquidating it at the earliest. |
| Reply: i still
maintain my target, though in worst case scenario
it could become 3000 psf inclusive all and if you
see current original booking which is at
2350+around 350 psf addl charges becomes 2700 psf.
Also scope of fire fighting and electrification is
there makinhg it around 2800 psf.
| |
|
 |
Booking
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Preeti Sharma |
| India , 8/22/2008
|
| Query: Pls let
me know if the RPS Savana apartments still
available in fresh booking and how much is the
booking amount and when is the possession of the
flat. |
| Reply: fresh
booking is at 2350 psf. Possession more or less
similar to previous lot. For pmt plan pls click
adjacent link. Booking amount 10 percent.
| |
|
 |
Badarpur Flyover
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Mahesh Khullar |
| India , 8/22/2008
|
| Query: Hi, I
have a flat in RPS Savana and plan to stay there
once the construction is over. I have my office in
GK. I plan to commute to GK everyday using the
Badarpur flyover. Has the work on the flyover
started? I am very bullish about Neharpar and dont
like any discussion going against it. |
| Reply: flyover
work expected to start next month. By the way for
GK you dont have to wait for badarpur. Surajkund
is even better alternative.
| |
|
 |
Near by Shopping
Mall (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Harish Poddar |
| India , 8/22/2008
|
| Query: Hi, Is
there any shopping Mall/arcade coming in the area
near RPS Savana. Also will there be Yamuna water
supplied by HUDA for drinking. I am not sure if
neharpar comes under HUDA. |
| Reply: there
are infact two commercials which are part of
savana itself. Area comes under HUDA but water
supply is normally handled by MCF. Exact details
would however be known near possession.
| |
|
 |
Thank U
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Payal Thukral |
| India , 8/22/2008
|
| Query: Hi, We
have a 3BHK in Savana. We plan to end use it.
However we are getting calls to sell it off from
brokers at 1930/sq-ft. Is it wise to sell it off
now. Also we are put up in rent now. My husband
has a job in Gurgaon. How feasible is it to
commute to Gurgaon sec 32 daily from Savana. Is it
wiser to go for something in Gurgaon. Please
advice. |
| Reply: as an
investment, you should hold on to investment for a
while. Fafridabad otherwise is central to most
geographical locations. Greater faridabad is
closer to noida, south delhi. Gurgaon would be
around 45-60 min commuting.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Shivam Vaid |
| India , 8/21/2008
|
| Query: Hi, The
latest photo of RPS savana is out. It seems the
work is really going fast if u compare it with the
15 day prior status. 2010 as predicted by u looks
on. |
| Reply: thanx
for update. | |
|
 |
Tower No. T -5
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Mayank Singh |
| India , 8/20/2008
|
| Query: I have a
3 bedroom , 1590 sq. ft flat in savana which i had
purchased in nov. 2006.. The last installment i
paid was in march , do you have an idea when the
installment is due? Is it possible for me to
cancel my booking now and ask for a refund from
rps?? or do i have to sell it to a third party
myself? thank you.. |
| Reply: resale
is a better option. Installments have been
demanded from various towers. Better to check next
installment status directly from developer.
| |
|
|
|
|
 |
Argreement
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Alok N/A |
| India , 8/18/2008
|
| Query:
Jitendra, My agreement with Savana was signed in
Oct, 2006. Only foundation has been completed in
my tower till now. i am an end user and had
planned to move into the appt in Oct, 2009. What
should be my plan of action? |
| Reply: wait
till year end to observe progress.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Sheetal Mehta |
| India , 8/17/2008
|
| Query: Hi, What
will happen to the piece of land adjacent to the
road. Will it be made a park or commercial. Rumors
are high that RPS will construct a MALL there.
Please let me know if u have some more
information. |
| Reply: None at
this point of time | |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Subhah Roy |
| India , 8/16/2008
|
| Query: Hi, Is
there any plan to widen the Gurgaon Faridabad Road
and to make it one way. This road would carry a
much higher bulk of traffic once Greater Faridabad
is inhabited. |
| Reply: there
are plans to widen the road further. Even today it
is wide enough but has some bottlenecks.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Nikhil Arora |
| India , 8/16/2008
|
| Query: Hi, Is
the market a bit down. I see no appreciation in
the resale market for almost a month. |
| Reply: property
is not stock market. It is this monthly
speculation which makes wrong set of investors
enter and then create panic. Normally monitor it
annually and best time to judge is possession.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Jay Chand |
| India , 8/15/2008
|
| Query: Hi
JitederJi, The progress made in RPS SAVANA as
evident from the pics suggests a lot still needs
to be done. Most of towers are almost only budding
and some have just got their 6th floor done.
Laying the total 17 floors for some 30 odd towers
and then doing the finish leave aside the amenites
and land scaping requires time. The timeline of
2010 does not seem feasible for now. However u are
more knowledgeable in this domain and hence need a
confidence booster from u. |
| Reply: 2010 end
is more than 2 years away. Dont worry, things
would fall in time. | |
|
 |
Hi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Nehal Sharma |
| India , 8/14/2008
|
| Query: Hi, Just
a couple of months back the resale prices of
Savana had almost appreciated to 2000 mark.
However RPS Rhythm has again brought it down to
1900. If this trend continues - now that BPTP park
floor is launched, with builders floating a lower
cost stuff every month, how feasilble does the
magic figure of 2800-3000 seem to u. |
| Reply:
developers are not making strategies for your
short term gains. My target is for possession and
savana is atleast 2 years away from possession. If
resale is 1900-2000 and original is 2350, we seem
to be moving in the direction of my estimates. My
target of 2800-3000 could also be both inclusive
as well as exclusive of addl charges. So including
all cost of original itself is 2700 psf even now.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Vishal Bhandari |
| India , 8/13/2008
|
| Query: Hi, I
recently visited Green Valley and found it to be
really good. Also one of my friend has a flat
there. The wastage of space inside was minimal. He
suggested I buy something in RPS SAVANA. He also
suggested that Savana will be much better made
than Green Valley. Is it true. Whats is
availability there. Also when is the possession
targeted. I think work is in progress but 2010
seems unachieveable. |
| Reply:
possession likely 2010. green valley otherwise is
unmatched project, in terms of proximity to delhi,
less wastage and better specs. savana is more or
less in resale so pls post a listing through
classified section. | |
|
 |
Hi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Nita Khanna |
| India , 8/13/2008
|
| Query: Hi
Jitender, Any update on the Badarpur flyover. Also
when is the widening of the Kheri Road going to
start. |
| Reply: update
on badarpur should be in our news section. Same
way it would be uploaded in news section when
something concrete comes up for kheri road.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Niharika Roy |
| India , 8/13/2008
|
| Query: Hi, I
have a 3BHK flat in Savana with Universal Specs. I
want to upgrade to International Specs. Whats the
procedure. |
| Reply: you will
have to check with rps office whether they are
accepting upgrade and if yes you would have to pay
upgrade charges. | |
|
 |
Car Parking
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Manohar Singh |
| India , 8/13/2008
|
| Query: Hi, Will
there be enough parking in RPS Savana. Each tower
requires to support 17 floors. Ideally a double
basement wud have done the trick. But I fathom,
the builder has stuck to a solitary basement. I
think Green Valley still has inadequate parking to
say the least. |
| Reply: green
valley does not have a complete basement, parking
provisions have been done after learning lessons
from green valley. Do you know any group housing
which has a double basement in residential society
? Or any other builder which has used your so
called trick in greater faridabad. FYI omaxe
heighs do not even have a proper single basement.
| |
|
 |
Hi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Kumar |
| India , 8/12/2008
|
| Query: Hi, Do u
think there is as much demand of housing as the
numbers exist in Greater Faridabad. Also lots of
projects are going to be under possesion soon,
BPTP, OMAXE and to some extent RPS savana. Is the
infrastructure ready for habitat. |
| Reply:
infrastructure is expected in 2010. Even though it
is habitable today also but for an urbanised
address that much wait is required. This is also
not the firdt time when such a big housing is
coming at one place. Rohini and dwarka are
examples. These two places were in an corner with
no great professional opportunities but still
managed to get occupancy levels as well as
appreciation. In comparision to gurgaon and noida,
faridabad is only place where a low cost housing
could be a reality and still accessible to all
delhi, gurgaon and noida. It is going to be a
residential mecca for all commuters in region
looking for quality and affordable housing.
| |
|
 |
Hi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Leekha |
| India , 8/9/2008
|
| Query: Hi, The
registration of independent floors is not allowed
in Haryana. How is BPTP suggesting Registrable
Floor. Does this mean registration is opening.
Also DLF has launched floors of around 1cr in
Manesar. Will it also be registrable. Also what is
the availability of 3BHK in Savana. |
| Reply: It has
been clarified n number of times. it is not floors
but approved group housing that builder is
choosing to keep lower height and give a floor
look. original booking at savana is at 2350 psf,
if keen for that let us know. for resale use
clasified section. | |
|
 |
Badarpur-Faridabad Flyover project
update (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Gaurav Gupta |
| India , 8/6/2008
|
| Query: Hi
Jitendra, Would like to inform you that the
flyover project has been awarded to Hindustan
Construction Corpn. (HCC) at a cost of 340 crores.
The full details are available in todays edition
of Dainik Jagran (6th August, 08). Kindly post
this in yur news section as it is related and
benefecial for all Nehar Par projects. The
completion target for this flyover is by October
2010. |
| Reply: name of
agency and time schedule has been frequently
notified on site. We would try to upload the news
mentioned by you as well.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Inder Kumar |
| India , 8/5/2008
|
| Query: Hi,
Although RPS is quite regularly updating the
construction pics, i am not convinced that the
possession of such a huge project can be completed
by July 2010. I have a 3BHK flat in the project
and am desperate to see it complete as I plan to
stay there. Please help remove the clouds from my
mind. |
| Reply:
possession can happen by 2010 there should not be
a problem. work upto ground floor takes longest
time and looks quite painful, subsequent floors
are added quite quickly.
| |
|
 |
QUERY
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Jasvinder Singh |
| India , 8/4/2008
|
| Query: I am
planning a property in Greater Faridabad and I was
looking towards Sector 88/89 and Sector 78/77. can
you please provide me a comparison on these
sectors. also please suggest me your property
investment recommendations in these sectors. best
regards |
| Reply: 77-79 is
on right of bridge. Bptp phase 3 plots. Projects
from omaxe, bptp, triveni, era, klj. Sec 79 is
proposed to be commercial sector. Sec 88/89 is
going to be left of bridge and has projects like
rps, triveni, piyush. Sec 77-79 is cost effective,
lower cost and still very prospective.
| |
|
 |
Hi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Arora |
| India , 8/3/2008
|
| Query: Hi, Do u
still consider ur estimated possession target of
2800-3000 is realistic considering the sluggish
market growth.Most of the builders are giving sops
of different kinds to get their stocks rolling.
Answer to this question will decide whether I buy
something in Savana. Practically it is the best
project in Nahar paar. |
| Reply: i still
maintain that on possession a flat should fetch
2800-3000 psf. | |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Dheeraj Mittal |
| India , 7/30/2008
|
| Query: Hi,
Whats the current price. Also when is the work on
Badarpur flyover finally starting. How is RPS as a
builder. |
| Reply: rps is a
credible builder. Resale price around 1900 psf and
you may check our classified section for more.
Flyover has been contracted to be completed before
2010 end. | |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Ganesh Mahadev |
| India , 7/26/2008
|
| Query: Hi,
Whats the availability of 3BHK. When is the
possession expected considering that they are
making good strides in erecting the building
compared to any one there. |
| Reply: 3+1 1791
sq ft is where some availability is there.
completion expected in 2010.
| |
|
|
|
|
 |
best location
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Kunal Puri |
| India , 7/21/2008
|
| Query: Hi
Jeetu. I have gone through many of the queries on
Faridabad projects. I am planning to buy a 3BHK
flat in new sectors of faridabad. I am actually
confused between RPS Savana (2250), Pratham, The
Resort etc....actually RPS savan suits me as I
would not have to give any money for next 24
months. what do you suggest would be the best
option to live in in terms of area, connectivity
and buider reputation. Any advise would be
appreciated. Thanks. |
| Reply: bptp
grandeura has similar scheme at 2150 psf. I
consider that location better and much neat and
clean. Construction advance stage, possession in 1
yr, developer reputed. Only difference is rps has
a better floor plan. We handle both. Absoluteky
your call. | |
|
 |
discount
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
sachin arora |
| India , 7/18/2008
|
| Query: sir, i
have booked one flat in 88 sec, i gave 2.5 lalk DD
in favour of RPS, but yesterday i got to know some
of dealers are offering discount also. my dealer
did not tell me about that discount plz tell me
what should i do now. |
| Reply: in most
original bookings dealers offer some or other
discount, less or more. Though technically that is
not ur right that you may claim or fight for. It
is more like a competitive trade compulsion for
dealers. You should have done at least some
homework. I dont see there is much you can do
anything at this point of time except requesting
company to cancel your booking and request refund.
| |
|
 |
Price increase
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
A N/A |
| U.S.A , 7/17/2008
|
| Query: As per
the RPS Savana site office, flat prices are going
to be increased soon. They dont have availabilty,
so what is the reason of price hike? Thanks!
|
| Reply: since
they have low availability they can afford to
raise their price. if someone is keen to buy in
original he would buy at new prices also.
| |
|
 |
New RPS booking
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Ravi mal |
| India , 7/7/2008
|
| Query: Hi
Jidendraji:Just wanted to know is there any
difference between Old and new RPS project.Is bank
funding available for new booking and is it
licensed and approved. |
| Reply: it is a
new soft launch. as much as i know it is licensed
but maps sanction and bank funding may take some
time. | |
|
 |
new project
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
sumir puri |
| UAE , 7/7/2008
|
| Query: i have a
1590 sq ft flat in t-11 in the savana
project.purchase was at inr 1300 psf plus premium
do u think it is better to sell the savana flat
and go for their new project rhythm for same 3bhk
|
| Reply: only if
you are not enduser, not availing bank funds and
not keen to pump more money.
| |
|
 |
Interested in
buying (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
vishal kapoor |
| India , 7/7/2008
|
| Query: I am
interested in buying 2+1,2BHK in savana
project.The floor preferably 2 ,3 ,4 th floor
|
| Reply: not
available in original booking. For resale use
classified section. Also consider new rps rhythm
project. | |
|
 |
RPS New Project
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Varinder Dhir |
| U.S.A , 7/6/2008
|
| Query: I want
to invest in 3BHk in Faridabad in New project of
RPS. I would appreciate, if you can let me know,
what could be the min. possible psf rate I can
get. I heard that the first rate is 1890rs. psf
from company. But, I believe you can get booking
less when you are going to finalize a deal with
the builder or dealer. Please suggest!! Regards,
Varinder |
| Reply: we are
offering a 3 percent dicount over and above 1890.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
Dealer Discount
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Sanjay Sahni |
| India , 6/7/2008
|
| Query: Hi, I
want to purchase 3+1 bedroom in RPS Savana, Sector
88 Faridabad in original booking. Can you please
tell me if it is available and if I can get any
dealer discount? How much it will cost? |
| Reply: we are
offering 4 percent dealer discount. we shall get
back shortly on availability.
| |
|
 |
Latest Pics
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Arun Kumar |
| India , 6/3/2008
|
| Query: Hi, The
Savana latest construction pics are updated.
However it will make more sense if towers are
mentioned below the snaps. |
| Reply: very
difficult to organise. still we would look into
it. | |
|
 |
purchase
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Sandeep Singh |
| Kenya , 5/31/2008
|
| Query: Hi
Jiteender ji, interested to buy 1303 sq. ft 2+1
flat OR 1590 sq. ftl 3 BR thru you. Need to
clarify few things. 1- Two partners are involving
in agreement - what r the formalities (both are
NRI)? 2/- What discount you are offering right now
on current price i.e. Rs. 2250/-. 3/- I u/s that
we need to pay 10% right now and rest (as EMI to
bank) will start on possession. CAN you please
highlight HOW…?? B’czo as per terms and conditions
we u/s or gets thru internet that indicates that
PAYEMNT SCHEDULE will start as follows … “at
booking 10%”, “on 01-.07-2008 – 15% of BSP + 50%
PLC + 100% EDC & IDC”……so on. IT’S REALLY
puzzling. 4/- any charges like and ADDITIONAL
CHARGES, EDC / IDC or ECC & FFC all will take
care thru EMI’s or one has to invest from their
pocket and if YES then HOW…… As per payment
schedule mentioned on web site???. Appreciate if
you explain me clearly so we can move ahead to
finalize the same without any hurdles b’coz right
now we have the impression that we no need to pay
anything till possession expect 10% booking
amount. |
| Reply: in case
of by now pay later, it involves a bank loan
processing, and i doubt a bank would process a
loan where two people are partners unless they are
husband/wife or father/mother/son. discounts 4
percent on bsp eitherway.
| |
|
 |
General Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Ashok Kumar |
| India , 5/31/2008
|
| Query: Hi
Jitender, How much do u think I can remain
leveraged considering that I already have 2
properties and plan to buy a third. All the
previous properties are having loan. Also I work
in an MNC and is subject to market volatility. I
do have the capacity to bear a loan to go ahead
with one more property(3rd). But sometime I get
prompted by people around me to rather close one
of the loans first and then go for the next. But
by the time I close one the market price will be
hugely different from what it is today for the
same project. I am in a dilema and hence need ur
advice. Thanks, Ashok |
| Reply: if the
properties you have bought have appreciated and
you feel liquidty at any moment of time should not
be a problem inspite of mild fluctuations and
including all pre-payment liabilities. you can go
ahead else wait for one to appreciate
significantly. | |
|
 |
RPS Savana
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Atiksh singh |
| India , 5/26/2008
|
| Query: Hi Sir,
i dont want Downpayment option. I wanted to know
if Time linked plan or CP will be better for me?
pls let me know |
| Reply: not much
difference CLP would have higher upfront while
time link would stagger that. both would complete
more or less same time. | |
|
 |
RPS Savana
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Atiksh singh |
| India , 5/26/2008
|
| Query: Dear
Jitu ji, For RPS savana 3 BR flat, how many slabs
have been completed? Shall I take time linked plan
or construction linked plan? Which one will be
better for me? Also, which tower is east facing
and north facing tower in “Purple Hazel” name for
1791 sq ft. |
| Reply: i cant
give directions off hand. construction presently
is till ground floor slab only. if going for bank
scheme then it is immaterial which ever one it is
while otherwise difference in CLP and DP is the
start of EMI and the monthly outflow. one may even
go for DP instead of CLP at this stage.
| |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Mahtab Alam |
| India , 5/25/2008
|
| Query: Hi, I am
in lookout of a 2+1 flat in RPS savana. Please
confirm availability. How do u compare Triveni
Oxygen to RPS Savana both as a project and also
the builder perspective. I find that Triveni
Oxygen specs are much better than RPS savana and
also the cost is only 2100 whereas RPS is 2250.
Only flip side is that Triveni demands 15% whereas
RPS demands only 10%. I feel overall RPS has a
more warmer regard compared to Triveni. Why are
the resale prices of Trveni so low. If ur
possession target is 2800/- then anyone who has
invested in Triveni gains more as they are the
cheapest available in the market. When do u think
RPS savana will be put into possession. |
| Reply:
possession expected around same time. The initial
lot of triveni were largely investors who were
here to make quick money and not endusers really.
Their panic selling never allowed premiums
flourish. Triveni was also utilising its funds for
land banking in many areas so was not even able to
cancel and refund such people. So triveni would
first have to be really visible on ground level.
And definitely at possession time most
uncertainities are over, so market prices should
be more or less same. If going for triveni, better
pick resale to have real price advantage else rps
original is better in new scheme.
| |
|
 |
More Info
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Dip Gh |
| India , 5/23/2008
|
| Query: Please
call/send more info on RPS Savana. Pls include
details on discounts, no emi till possession..etc.
|
| Reply: all
details are on site. Pls specify or elaborate on
more details. Discount 4 percent of bsp.
| |
|
 |
RPS new scheme
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
ghanshyam rawat |
| India , 5/19/2008
|
| Query: I have
few e.mail corresponence with u in last week,
reqest u somebody who deal in this project, call
me to understand better way to invest in this
project. |
| Reply: we shall
get back shortly. | |
|
 |
Resale or New
Booking (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
R Kapoor |
| India , 5/15/2008
|
| Query: I am
looking for 3 bedroom (1590 sf) flat. Which will
be better - resale or direct booking. Please
discuss pros and cons |
| Reply: if you
are okay with an upfront of 10-11 lacs including
5-6 lacs cash premium and have suitable free time
and patience for resale hassles you should go
ahead with resale. But if you are keen for a neat
clean direct deal with a booking amount of only 10
percent and no cash outflows for 2 years (which
itself can mean an opportunity cost) and have a
good eligibility go for original. Interestingly
where no emi or interest payment starts, it does
not reflect in any bank statements so may not
affect your future eligibility. If this still
remains explained, a face to face meeting is what
i could suggest. | |
|
 |
Query
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Mittal |
| India , 5/15/2008
|
| Query: Hi
Jitender, If one books at 2250 (10% scheme), can
he sell it in the near future if he sees a price
appreciation beyond 2250/- in the resale market.
|
| Reply: i see no
problem but that would be only possible when
resale market grows upto the level. Also if you
are not having any other liability what is the
hurry in selling before 2 years.
| |
|
|
|
|
 |
Possession time
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Rahul Sharma |
| India , 5/14/2008
|
| Query: Hi
Jitender, As per the new scheme, the emi starts
after possession or 2 years from now. Does this
mean that possession may get further delayed.
Remember the project is already running 1 year
behind schedule. |
| Reply: they say
two years or possession whichever is earlier which
means they may even try to do it earlier say 18
months so that they do not have to bear the EMIs.
| |
|
 |
Significance of
new payment plan (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
M Saqib |
| India , 5/14/2008
|
| Query: RPS has
chnaged the payment plan to 10 % upfront. what
does this signifies. does this mean they are not
able to sell the flats in the construction linked
plan . I am not sure how to interpret this change.
Request you to comment on its signifance in terms
of Savana project |
| Reply: dont
read to much into it. they have worked out a spel
pmt plan with a few banks of buy now pay later and
are interested to sell under this plan only. If
you go by construction link plan for a new booking
the upfront increases considerably, it is to make
those comfortable that the new plan is made, else
those who dont want to go for it could pick a
resale from the market which should be cheaper.
| |
|
 |
next demand
letter (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
manit saluja |
| India , 5/13/2008
|
| Query: Hi
Jeetendra , Woudl youve some idea about when is
the next demand letter expected based upon
original construction linked plan ? |
| Reply: expected
by may end and early june in some towers. cannot
give exact details of tower nos.
| |
|
 |
Shop
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Ashutosh V |
| India , 5/12/2008
|
| Query:
Interested in shop @ Savana. Pls. confirm
rates/size . |
| Reply: min size
around 200 psf. Rates 7000-9000 psf. two location.
one inside is galleria where price is 7000 psf
while other arcade is main kheri road (proposed
130 ft) where price is 9000 psf (min size 380 sf).
it is in down pmt plan and entire pmt is to be
paid in 2-3 months. No bank funding applicable.
| |
|
 |
RPS time linked
payement plan (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
N/A N/A |
| Other , 5/12/2008
|
| Query: hi
Jiteendra, Can you clarify whether existing buyers
under original construction linked payement plan
gets effected by this new time linked payement
plan ? also, please suggest how does this new time
linked plan attracts buyers ? anybofy woudl like
to make payement on seeing some real construciton
progress. |
| Reply: pmt plan
applicable for new bookings only. It is not time
linked plan but the fact that a person pays only
10 percent and no payment for next 2 years, not
even the bank interest. Which makes ot attractive.
And since units are being offered in all towers
including old ones, so construction would go at
same pace for all irrespective who booked when.
| |
|
 |
RPS time linked
plan (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
N/A N/A |
| Other , 5/12/2008
|
| Query: Hi
Jiteendra, I noticed that indiaspace.com for RPS
project is still reflecting the payement plan as
CONSTRUCTION - LINKED PLAN I think this is not
correct as it is now no more construciton linked ,
infact it is now time linked. |
| Reply: plan is
same. the terminology has been wrongly used as
construction linked instead of time linked which
shall be corrected. | |
|
 |
commercial
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
harsh pal |
| India , 5/10/2008
|
| Query: Hi
jitendera ji, I just saw in the flashing news
about the commercial project and few shops
available so can u pls tell me the size and price
of shops and also the initial payment required ???
|
| Reply: expected
price is in the range of 7000-9000 psf. We will
get back to you with details.
| |
|
 |
hi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
debjani N/A |
| India , 5/9/2008
|
| Query: Hi ,
dont you thik the new pricing policy of RPS will
adversly effect the resale market of RPS. now the
cost of borrowing will be cheaper then old rate
1900 or 2100 |
| Reply: i never
believe in short term resale. Have you ever seen
us too bothered about resale. Infact the entire
market would flourish well if people buy with
atleast an arrangement or mental make up till
possession by way of self funding or bank funding.
Real estate is different than stock exchange with
daily trading worries. At the time of possession
all units should be similar priced irrespective of
scheme. | |
|
 |
BBA docs
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
N D |
| India , 5/8/2008
|
| Query: Hi, I hv
buy a flat in RPS savana and got the loan from the
Axis bank. Earlier my payment plan is Construction
link plan and then changed changed to Down payment
plan. Now due to change in payment plan Builder
Buyer agreemnt docs also should be changed
accordingly for this RPS ask me a NOC (Axis bank
dont hv any objection in changing the payment plan
) letter from the Axis bank. Axis bank has
released the NOC letter and now RPS said we want
Second Copy of Builder Buyer agreement docs as
well without that they cannot changed the Builder
buyer agreement and Axis bank said we cannot give
you a Builder Buyer agreement docs. Now you please
suggest me what i hv to do becoz i dont hv Builder
Buyer agreement copy with me which i needed.
|
| Reply: safer
option go for the original payment plan else due
to delay in payment the accrued interest would be
more than the benefit you gain due to down pmt
plan. Axis should release the agreement if no
disbursement has happened but if some disbursement
has happened technically it is not possible to
change pmt plan. | |
|
|
|
|
 |
Photo Update
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Ravi Khanna |
| India , 5/7/2008
|
| Query: Hi
Jitender, The latest pics are updated. It seems
the project is making very very good progress.
Sending link.
http://www.rpsgroupindia.com/housing/savana_gallery_site.asp
|
| Reply: thanx
for feedback. | |
|
 |
investment
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
N/A N/A |
| Other , 5/5/2008
|
| Query: hi i
booked a 3 bedroom -1590 sq ft in rps last year.
wud like to know its position as regards to
investment purpose since i dont stay in india.
also can u also suggest any other property for
investment in FNG |
| Reply: rates
have been steadily appreciating. It is recommended
to hold till possession when we are targetting a
rate of 2800-3000 psf. Consider omaxe palm greens
greater noida, bptp sec 37d gurgaon.
| |
|
|
|
|
 |
Approach to
Nahar Paar (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Rajan Mehra |
| India , 4/23/2008
|
| Query: Hi
Jitender, Besides the slum kind of approach from
Mathura Road, is there any other one in pipeline.
This slum approach is going to be a huge
bottleneck due to lack of scope for road widening.
|
| Reply: infact
the main approach as per master map is the new
bptp bridge and then internal proposed sector
roads so approach would undergo a sea change by
possession. | |
|
 |
Pent House
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Neeraj Sharma |
| India , 4/21/2008
|
| Query: I m
looking for pent house kind of apartment. whr we
have all the personal aminities . If you have some
thng like tht pls send me the details with price
and if any bank is finance is avilable. |
| Reply: check
out penthouses in rps savana or omaxe spa village
project. Click link from home pg.
| |
|
 |
Badarpur Flyover
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Asish Garg |
| India , 4/10/2008
|
| Query: Hi
Jitender, Has the work on Badarpur flyover
started. Will the common wealth game impact its
completion? Also is there any update on the Noida
connecting expressway from near RPS SAVANA ?
Thanks |
| Reply: there is
a detailed news in our news section on that.
Tendering completed. Contractors short listed.
Work to start within 2 months. Completion sep
2010. Work on other expressway is reportedly on at
many patches though not much info available on
actual status. | |
|
 |
RPS Puri
comparison (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Yatin Kundra |
| Other , 4/4/2008
|
| Query: Hello
Jitender, Between RPS and Puri construction which
is better with regards to enduser purposes. I dont
want to go for BPTP grandeura as its specs dont
appeal to me (bedrooms are very small).Also When
do you think RPS is going to disclose its new
rates. |
| Reply:
Grandeura is still my recommendation - best
location, more or less similar priced and advanced
stage of construction which gives sense of
security. bedroom sizes in Puri looked more or
less similar to me. RPS has a delivery track
record and project looks worthwhile. For Puri it
is first project as independent developer for this
level. Location fine almost next to grandeura.
| |
|
 |
Interest levied
on down payment (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Anand Kumar |
| India , 3/31/2008
|
| Query: Hi, i am
a owner of one RPS savana Flat and went for down
payment. Bank loans disbursal delayed due to
incompletion of papers from RPS group side. later
when the RPS management approached, they said they
will charge interest if any, at bank loan interest
rate and that too for the period of delay only.
but now i received a letter from their side
mentioning interest @ 18% and even compunded
interest for the more than one year period is also
levied making it to Rs. 24000. We are the one who
had paid money in advance even when the project is
delayed by more than a year.. suggest what should
be done??? |
| Reply: That is
the biggest risk in opting for down pmt plan. a
builder never hard sells this plan in case you are
dependent on bank funding and in case bank refuses
to fund in down pmt plan (which is very common
these days) builder does not (and actually should
not also) own up any onus for the same as it is
banks internal policy. we had been suggesting
people not to go for down pmt unless they have
clear understanding how that money is gonna come.
A better remedy could be requesting company to
migrate from down pmt to const link. even
otherwise representing it personally is the only
solution. | |
|
 |
Extra payment
demanded at time of possession (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Ankit Gupta |
| India , 3/28/2008
|
| Query: I have
heard from many people that at the time of giving
position of the flat, Builders generally charge a
lot of money which was not disclosed earlier. Is
this legal and what are the terms under which they
charge this money? Can we take in writing from
builders that no extra money shall be demanded
apart from the defined payment plan? |
| Reply: normally
there is no escalation clause so that already
protects. but in agreements there are ceratin opne
cluases. since you mentioned RPS Savana, in green
valley at possession, IDC was imposed by govt
which was charged extra. Fire fighting and
External electrification was demanded on
possession as it was mentioned in agreement that
same would be charged as per actual expenses. They
are likely to repeat same for savana. Builders
like omaxe has started charging increased super
area at time of possession e.g. nile, nri city
etc. | |
|
 |
RPS - IT PARK
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Punita Arora |
| India , 3/25/2008
|
| Query: I would
like to know that, when RPS will launch its
IT-Park? Need some information about it - assured
return, location benefit, better than piyush or
crown. Please guide if you have any information
regarding this. |
| Reply:
LOI/license awaited. So it would take some time
for launch/assured return etc. Some how i dont
consider piyush in the same league. I doubt if
piyush IT is above 5 acres which is a minimum
requirement for selling units in smaller parts of
1000 psf. Crown and rps are more or less similar.
crown is while coming from delhi and rps is
towards delhi. Crown has a lower price advantage,
easiest approach from delhi, LOI received.
| |
|
 |
construction
pics (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
sunil rattan |
| Oman , 3/23/2008
|
| Query: i feel
if RPS mention tower nos also on the pics itself
on their website it will give much better idea to
customer and will reduce number of queries on your
site |
| Reply: we would
forward the feedback. | |
|
 |
Construction
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Bharat Kumar |
| India , 3/19/2008
|
| Query: Please
let me know the construction status of Tower 8 for
2 plus study flat as I have still not received
demnd letter for foundation stage. |
| Reply: pls
appreciate we dont have tower level status unless
developer makes it public. We would request the
company to provided updated status and upload the
status once we get it. | |
|
 |
faridabad
neharpaar area (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
manit saluja |
| India , 3/14/2008
|
| Query: Dear
Jitender, Can you clarify that who is responsible
for building basic civic amenities like water ,
sewerage , electricity in faridabad neharpaar
area. |
| Reply: govt
agencies like huda and they have received several
crores of rupees as edc/idc from various builders
to provide this. They have to do it else one can
even file an RTI to seek an explanation. But it
would take no less than 2-3 yrs. Process for
acquistion of land for the same has already been
initiated. | |
|
 |
Parking charges
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Gagan Ajit |
| India , 3/14/2008
|
| Query: RPS in
their existing price list have removed open
parking and only covered parking for Rs 150,000/-
is mentioned. What does this imply for old
customers. As per the agreement old customers have
to pay Rs 75,000/-for open parking booked by them.
Will these parking charges waived off or old
cstomers will be forced to pay Rs 150,000/- for
covered parking. Also there is no mention of fire
fighting charges etc in the price list. Will it be
charged at the time of handover. |
| Reply: parking
charges frozen in agreements would remain valid.
New charges are applicable for fresh bookings.
Open parking have all been sold out and that is
why they are not offering open any more.
| |
|
 |
Superb Job
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Resham Seth |
| India , 3/14/2008
|
| Query:
Compliments to you for doing an excellent job for
promoting Greater Faridabad and I feel your
website should be rewarded by Haryana government
for promoting Nehar Par area which no other govt
or non-govt agency has done till now. Please let
me know the status of Tower T8( 2+Study) as I have
till date not received any demand letter for
foundation stage. Kindly check using your good
offices. Regards. |
| Reply: thanx
for comments. We as such do not have tower level
status. If you can make a posting through
grievance section we can forward the same to
company for appropriate reply.
| |
|
 |
Penthouse suite
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
mona raman |
| U.S.A , 3/12/2008
|
| Query: Dear
Jitender ji, Thankyou for keeping us updated and
all your hard work. I am inenquiring about RPS
savannah 3 bedroom penthouse suite. What can one
expect as far as price for end user. Would you
reccommend this project or another similar one as
I am interested. Also what are the long term
prospects as far as penthouse suites are
concerned. Lastly can you pplease update BPTP
Parklands images for latest developments. Thanking
you once again. |
| Reply: i would
try to update the pictures. penthouses are not a
very hot selling item so should be bought with
caution strictly from possible end user
perspective. In the same price bracket one can
also opt for overall luxury projects like omaxe
spa as well. there one can even opt for lower
floors, more liquidity and luxury, lastly the
social segment for entire tower is similar which
may or may not be applicable for penthouses.
| |
|
|
|
|
 |
Demand Letter
Received (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Satish Mishra |
| Singapore , 2/27/2008
|
| Query: For the
information of all investors of RPS Savana, Ive
received the demand letter which was due on
foundation completion for my booked flat in tower
T-12. |
| Reply: thanx
for the update. | |
|
 |
Next demand
letter for payment (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Abhishek Singhal |
| U.S.A , 2/20/2008
|
| Query: Hello
Jitendra, I had booked a 3+1 apt in RPS throuh you
in 2007 in tower B10. Can you please tell me when
is the next demand letter for payment expected
from RPS? |
| Reply: demand
letters are constructuion linked. expect a letter
every alternate month. | |
|
 |
Road Connection
to Delhi (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Bhupender Singh |
| India , 2/13/2008
|
| Query: Im
planning to buy a flat in RPS Savana Fbd but
little bit confuse with this areas connectivity to
Delhi. The kalindi kunj bypass road is not at all
safe at night as its too dark out there and the
road connecting the project from the canal is also
not very good as some local shops & village
area comes enroute. Will you be able to advise
whether the road just outside the project will be
broadaned and which will be the best way to
connect to the delhi. How far this place will be
from Gurgaon, Noida and Greater Noida?- thnx
|
| Reply: on as is
to where is basis if you see that way bptp
grandeura should be the best project. From the
national highway turn left towards sec 15 and when
we go straight over the new bptp bridge then you
reach the project. Else lot of connectivities are
proposed. | |
|
|
|
|
 |
Help on loan
processing (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Najmul Hoda |
| India , 2/11/2008
|
| Query: My laon
from HDFC bank for this project has been
approved.I have been doing this using one of the
refernces(Ashish Shukhla) mentioned in RPS side.On
30 th of Jan I got the approval email from HDFC
bank and they said that offer letter is being
sent.Till then i did not receice any offer letter
so far.However HDFC bank Faridabad did manage to
send copy of the same to RPS so that they can
prepare necessary documents for loan
disbursement.I had a call from RPS for the same
asking for one documents to be filled by me and
she is sending the doc to me on email.I am a
novice, just need a favour from you to ask that
whether the loan is getting processed in the right
way or not. Please do suggest me also what all
docs are required from RPS side.Thanks |
| Reply:
mr.shukla is a responsible HDFC employee and rps
is a responsible developer. Normally
docuementation reqd include - Builder buyer
agreement, demand letter, allotment letter,
tripartite agreement, permission to mortgage and
original receipts. | |
|
|
|
|
 |
RPS SAVANA vs
SRS (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Ashish Jain |
| India , 2/7/2008
|
| Query: Hi, SRS
is also offering same configuration 2+1 as RPS and
both are in nearly same location. I need advice on
which one is better. Is there any difference in
term of possesion date or quality?. Please help as
I am planning to buy shortly |
| Reply: i would
recommend rps over srs any day. Also inspite of
same sector rps has a better location, bigger
project size, experienced as regards handling a
residential project and is more credible.
| |
|
 |
late delivery
and quality (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Anjum Khan |
| India , 2/5/2008
|
| Query: First of
all thanks for all your efforts to answer our
queries. I really appreciate your efforts. You
dont know but actually you are answeing the
questions that we all have at some point of time.
I see many posts related to the timely delivery of
the RPS Savana project and your assurance in your
replies that they would be able to complete it on
time. I am 100% sure that they will be, because
they will have money to add in more labours and to
do some better management to ensure the timely
delivery of the raw materials to attain the goal.
We are all not worried about completion of the
project on time. BUT my query is what would be the
quality of the construction that is done in 60% of
actual planned construction duration? 1. What are
the ways that we can appeal regarding the bad
construction and to whom? 2. What compensation we
can ask when we appeal to those authorities? 3.
Looking at the current rate of property dispute
what is the minumum time that you think would be
good enough to solve such dispute? |
| Reply: there is
no legislation to control quality as it does not
get documented anywhere other than specifications.
Bad quality can be handled only in one way i.e.
Developer remains self conscious that it may
adversely affect its credibility and sale of
future products. | |
|
 |
price
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
rahul rattan |
| India , 2/1/2008
|
| Query: daer
jitendra, what is the current market price for
2bhk flat and what price you think at the time of
possesion |
| Reply: around
1700. Better check classified section for exact
offerings. Possession target 2800-3000 psf.
| |
|
 |
Purchase of
Luxury Apt 2360 in Tower 14 (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Amit Datta |
| India , 1/30/2008
|
| Query: I am
interested in purchasing a 4+1 Luxury (2360 Sq
Apt) in Tower 14 in RPS Savana in Faridabad Sector
88. This needs to be a south facing apt (ie either
#3 or #4) My price is 2000 psf. |
| Reply: Pls post
a listing through our classified section.
| |
|
 |
Deman Letter
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Shruti Swaroop |
| India , 1/29/2008
|
| Query: Hi, You
had mentioned in the breaking news early on in Jan
that the foundation work for T11 has started. I
still havent recieved the deman letter for the
same. Is it something to be worried about? Thanks
|
| Reply: nothing
to be worried reeally. however you may check with
rps directly for a clarification.
| |
|
|
|
|
 |
want to sale
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
De8epika Sarvesh |
| India , 1/20/2008
|
| Query: In RPS
Savana sec 88 Faridabad.It is 10 - 12 km from
BadarPur Border.This RPS Savana Project is 50
acres township residential colony in Sector-88 at
Faridabad. House no 1003 , 10th Floor Tower no 4
Blue beach Tower.I want to sell this flat at
Rs1700. |
| Reply: Pls use
classified section. No point posting listings on
this pg. | |
|
 |
Tower T10 status
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
Nitin Mishra |
| India , 1/17/2008
|
| Query: Hi, What
is the status of T10 tower? Has excavation started
? I called up RPS and they are saying foundation
is completed but your news flash does not show
this. Can you clarify ? |
| Reply: we would
clarify it. | |
|
 |
PLC CHARGES
(RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
SHALINI MAHAPATRA |
| India , 1/13/2008
|
| Query: DEAR
SIR,I HAVE FLAT IN 16TH FLOOR INCIDENTLY WHICH IS
PARK FACING,RPS IS ASKING PLC CHARGES WHICH SEEMS
ILLOGICAL CONSIDERING THE FACT FROM 16TH FLOOR
NOTHING IS VISIBLE,LEAGALLY IS THERE ANY SOLOUTION
OR PLEASE SUGGEST AMIACABLE SOLUTION.REGARDS
|
| Reply: it is
not about visibility from a particular floor but a
location charge of bring a green facing. You have
to accept it or you can request them to change
your allotment to a non-PLC unit.
| |
|
 |
RPS Savana
location (RPS Savana Faridabad)
Contact for More
Details See More Projects |
| Posted by :
sriram sridhar |
| France , 1/9/2008
|
| Query: Kindly
post your view on RPS project location and
possession target?Is it worth buying from enduser
point of view? |
| Reply: worth
buying from all perspective. Sec 88 closer to
proposed expressway from noida. On existing road.
| |